Technical project leader - project Manager

Publiée il y a 3 mois
16 Visites
A propos

General Skills

Share my professional experience, my international automotive culture and my skills acquired in the studies and development and industrialization of automotive equipment, with manufacturers and suppliers.

•Team management / Team Leader / International team leading

•Supplier monitoring and management

•Product - Process - Geometry convergence / Design – Style Convergence

•Experience working on a builders platform, knowledge of development processes of a vehicle from preliminary studies to production start-up

•Supplier approaches: consultations, launching of tools, follow-up, development.

•Vehicle architecture and design model monitoring. Geometry (functional analysis, chains of dimensions, isostatism). Analysis and resolution of defects in industrialization

•Logistics, order control for multi-version projects. Organization of receptions of parts

•Communicative, motivated and dynamic and international mobility

Compétences

27 YEARS OF EXPERIENCES

SEGULA TECHNOLOGIES - June 2009 until now

Project Manager design stage - CLA ( component leader applicative) during industrial stage

•OPEL Automobile GmbH – Russelsheim – GERMANY – Design stage

•STTELLANTIS Slovakia – Trnava – SLOVAKIA – industrial stage (Until now)

Full Exterior scope BIW

Bumpers/Mudguards, tailgate embellishers, spoiler, emblems and monograms, lighting (headlamp rear lamp reflex ) , closures and doors looks, Wheel arch-Sill claddings, underbody panel, Mirrors, Wiper – washer , Glazing, BIW for FR/RR.

Tasks performed:

“Smart car” program two vehicles on the same plate form: OV24e (OPEL hybrid-electric) and CC24e (CITROEN hybrid-electric)

Design Stage, Management of 8 ICM Technical lead Engineer Design / engineer = total 32 peoples

Industrial Stage : 6 ICM Designers PCF ( supplier geo) PCV ( car geo) Analyst = total 28 peoples

International team management ( China- Germany- India )

QCDP ( quality , cost , timing and Performance) followings according Project target

Monitoring of ISS – issues and ECR ( Engineering Change Request) until monitoring physically and close

Management following and reporting for the full scope QCDP progress and target to high level project

Management and lead of Analysis LV1 result for taking in account resolution of all design issue in the team

Product – Process – geometry and style-technical convergence for full exterior perimeter

Full management under PLM System / CATIA under PLM / Sigapp-NFC / Devin/ Matsub-IMDS/ Titan

Tools and checking fixture – Validation plan –Homologation and certification

Industrialization following until now – End of project will be  SOP June 2024

Technical Project leader

RENAULT/AVTOVAZ –VESTA Face lift Project – Bumper and lighting – RUSSIA: TOLIATTI – IJVESK (industrialisation)

Tasks performed:

Full developments and industrialization of the vehicle all versions

Product – Process – geometry and style-technical convergence for Bumper and lighting perimeter

International team management ( France – Romania – Morocco – India)

QCDP ( quality , cost , timing and Performance) followings according Project target

Monitoring and management of suppliers

Tools and checking fixture – Validation plan –Homologation and certification

Industrialization following till MA ( Start of Production)

Technical Project leader

PSA-Peugeot – K0R Project – All exterior equipment including all glasses –KALUGA RUSSIA -

Tasks performed:

Handover development and industrialization of the vehicle all versions

Prospecting and evaluation of local suppliers and monitoring and management of suppliers

Product – Process – geometry for perimeter : Bumper, Mudguards and All Glasses

Local Integration Russia (local suppliers and materials) with Validation by PSA Europe laboratories.

Organization of parts receptions and dispatching on the production line on time. Reception of IODs, follow-up of validation plans, tools and jigs , Piloting of parts development

Industrialization following till SOP 3 month

Technical Project leader

RENAULT/AVTOVAZ –XRAY Project –Dashboard / console / Cross-car beam–TOLIATTI RUSSIA -

Tasks performed:

Handover development (RTR Romania) and industrialization of the vehicle all versions

Product – Process – geometry full check with Handover done for industrialization

Management of formalizations, design reviews, robustness of definition files for top RO.

Monitoring and management of suppliers / (adaptation of definitions to the Supplier process).

Tools and checking fixture – Validation plan – Homologation and certification

Industrialization following till SOP

Technical Project leader

PSA-Citroen –X81 China (C5) – All Interior and exterior lighting – VELIZY FRANCE -

Tasks performed:

Full development of the vehicle all versions

Manage the design with product-process-geometry synergy of interior and exterior vehicle lighting

Manage parts tracking files and evolution of Style - CCM

Monitoring and management of suppliers in France , China and Czech republic

Check list followings – Open issue list

Management of formalizations, design reviews, robustness of definition files for top RO.

Technical Project leader (serial life Pilot)

RENAULT - M2S serial life of J81 phase 4 and restyling for Laguna –Lighting and signalisation – TCR Guyancourt FRANCE-

Tasks performed:

Serial Life team leader and Full development Day Running Light for Laguna Renault

Management of quality, cost and timeframe objectives, with eco solutions for the full lighting perimeter

Monitoring and management of suppliers in France , Spain ,China ,Germany

Product-Process-Geometry –Style synergy for DRL and robustness of definition files for top RO

Check list followings – economical solutions - LUP

Technical Project leader

RENAULT/CRP – EV3 electric car demonstrator design - prototype - All exterior equipment and lighting-FRANCE

Tasks performed:

Full development of an Electric Demonstrator car (prototype)

Complete preparation of the Design and architecture and installation files (compliance with lighting and bumper standards and regulations).

Headlamp and rear lamp’s and Bumper’s design team leader in compliance with ACLASS

Installation of interface screed devices for the external equipment for the demonstrator

Matra Automobile Engineering – February 2005 to June 2009

Project Coordinator - Deputy project manager

RENAULT TRUCKS DEFENSE (RTD) –SHERPA Project – Full car management Prototype / development / industrialisation

Tasks performed:

Full developments, prototypes and industrialization of the Military vehicle for all perimeters

Pilot and monitor the digital model reassembly of the 8 types of silhouettes.

Piloting suppliers and cable fitters on the 5 Prototypes assembly vehicle, drawing up routing files.

Animated the advancement of technical subjects all scope (team of 16 peoples)

Ensured the product-process synergy of developments

Develop and monitor a control plan

HPI - Group KOYO SEIKO – September 2002 to February 2005

Design engineer

PSA G9 -V (restyling: 807, Jumpy, and Expert) - Full developments and industrialization till SOP

Tasks performed:

Responsible for the development and implementation of hydraulic steering wheels systems.

Design of the mounting system for the electric pump unit on the vehicle (sheet metal support), tank (plastic molding), and pump body (foundry).

Position calculation of filtering elements (inertia matrix).

Management of technical requirements (PSA).

Implementation and monitoring of the validation plan

Management of detailed and overall Drawings.

French / international supplier management (sheet metal, foundry, plastic, electronics) (China- Germany- India)

VALEO– June 2000 to September 2002

Design engineer

Wiping Systems Division –Reuilly (60)-France

Manage a design project for new windshield wipers integrating innovative aero-acoustic, aerodynamic, design and aesthetic factors

Check list followings – Open issue list

Management of formalizations, design reviews, robustness of definition

.

Lighting and Signaling Division in Sens (89) -France

Monitoring and management of reserves

Manual workstation layout

Supply Management

Monitoring of tooling definitions (China)

STUDIA (Mechanical Studies Services) – November 1998 to June 2000

Design engineer / team leader

Hybrid Engine modification team leader and Lighting following designers implanted in Valeo (Bobigny)

Pilot on the design and modifications of the electric motor for hybrid use

Supervision of three designers on the project Hybrid Engine

Management of detailed and overall Drawings

Supervision of two designers from VALEO lighting Bobigny

Diplômes

2010- CQPM 1996 11 20 0146 -Charge de projets en conception mecanique

UIMM -metalurgie covention DIPLOMA

1998“MECHANICAL DESIGN ENGINEER” - specialization in systemic product design –

CSP - (conception systémique de Produit)

IPSé - Institut Polytechnique de Sevenans ( UTC engineer school Group )

1995“BTS (higher technician certificate) MECHANICAL, specialization in tooling design and production -ERO- ( ETUDE ET REALISATION D’OUTILLAGES) –

CNET Cachan (CENTRE NATIONAL D’ETUDES TECHNIQUES DE CACHAN)- FRANCE

Compétences linguistiques

Russe (Notions)

Anglais (Courant)

Détails de l'offre d'emploi
Ce que je cherche
ContractType
Contrat à durée déterminée
Horaires
Temps plein
Salaire
RUB 350000
Expérience
Expert
Contact